8 January 2006

Details (tasks and personnel)

Analysis Plan 2005 data

I.        Short term

A.    Pmuxi measurement

a)      Blair’s thesis                    Blair

b)      Pmuxi paper                     Blair, Mike, Dick

c)      TEC NIM paper              Glen, Jingliang, Grant

B.     Pmuxi systematics

a)      Fringe field depol.

(1)    TEC in data        Jingliang, Anthony
(2)    B2 sets                 Dick
(a)   beam char.            James, Glen, Dave
(b)   TEC deconvol.      James, Jingliang

b)      Stopping tgt depol.          

(1)    PC6 stops             Dave
(2)    pure Al stops       Dave, Vladimir

C.     Rob’s thesis                                         Rob, Carl, Art, Jingliang

II.      Intermediate term

A.    2005 data                                                Jingliang

1.      quality checks                           Ryan

2.      t0                                                   Art

3.      alignment                                   Ryan, Renee

B.     Mofia improvements                            Art

1.      small angles                              Anthony

2.      first guess                                  Anthony

a)      broken tracks                   Anthony, Konstantin

b)      asymm cells

c)      windowing, classification  Roman, Art, Mike

3.      STRs from data                         Jingliang

C.    Westgrid processing

D.    energy calibration                                Makoto, Ryan, Carl

a)      alternate                           Roman, Art, Ryan

E.     treesumming

a)      vertex cut                         Rob, Ryan, Mina

III.    Ongoing

1.      GEANT4                                      Mina, Peter

2.      magnetic field                            Ori, Glen