8 January 2006
Overview
Analysis Plan 2005 data
I.
Short Term
Priorities (before mid February)
A. Pmuxi measurement (Blair’s thesis, TEC NIM paper, Pmuxi paper)
B. Pmuxi systematics from 2005 data (Fringe field depol.,
stopping target depol.)
C. Rho and delta results (Rob’s thesis)
II.
Medium Term
priorities (up to mid April, assess at collaboration meeting)
A. Prepare for 2006 data (beam-line mods,
DS scint.,
TEC or detector changes ?)
B. Analysis of 2005 data (new rho,
delta, Pmuxi results, if warranted)
III. Ongoing (review at collaboration meeting)
A. GEANT4
B. Magnetic field modeling