Set Runs Start End Warnings SolDSNMR Comment 40 391 21588 21986 7 20006 G running with graphite target 21593, 21639, 21683, 21740; connection error slits and jaws at F0 widened 21600, 21689; Hardware problem to increase muon rate 21646, 21735, 21743, 21786, 21792, 21805, 21831, 21909, 21939;Missing TDC header generated from the graphite 21697; Pulser mismatch target at a lower current. 52 119 22000 22122 3 19605.5 G taken before the Oct 26 22059, 22081, 22094; sync error maintenance day 41 292 22123 22422 7 19605.5 G taken after the Oct 26 maintenance day 22154, 22161, 22235, 22320, 22320; sync error RF booster on cyclotron engaged during 22185, 22209, 22237, 22349, 22369, 22385, 22394, 22416; missing TDC header these runs 22396, 22417; empty 42 404 22434 22842 4 20407 G 22438, 22448, 22500;sync error 22547, 22664, 22680, 22773, 22773;missing TDC header 22812; connection error 43 689 23024 23632 19 20006 running with Beryllium target EBuilder failed:23142, 23319-23327 on old target ladder. F0 widened 23412, 23481,23576 slightly to allow more rate. sync error: 23318, 23411, 23570 Otherwise nominal TEC in connection broken:23480, gas degrader setting restr. stopping pulser mismatch: 23494 at z = -0.7cm Hardware Alarm: 23575 44 392 23852 24253 10 20004 B2 + 6G sync error:23876,24249 continuing with Be target Hardware alarm: 23948,24151,24160 restr. stopping at z = -0.7cm EBuilder fail:23989,23990,23992,24131 pulser mismatch:24239 45 365 24288 24671 18 20004 B2 - 10G HV problem;24292,24318,24342,24348, continuing with Be target 24377,24427,24459,24480,24481,24565 restr. stopping at z = -0.7cm 24582,24603, 24637,24638, Ebuilder; 24293,24583,24647 Pulser mismatch; 24546, 46 24737 24815 20004 PC6 stopping data data taken at various HV settings TEC in 47 364 24914 25278 20004 PC6 stopping data data taken at various HV and rest_zstop settings to optimize this stops in PC6 48 369 25372 25741 20004 Pure Al stops TEC out, C target, stopping distribution moved by He degrader to significantly reduce the fraction of stops in PC5 comp./wi PC6 49 334 25778 26116 4 20004 nominal data set, TEC out Ebuilder: 25871,25872,26100 taken to improve statistics on the HV: 25925, depolarisation systematic 50 335 26117 26452 20004 B2 + 6G data set taken Pulser error:26361, 26362 to improve the statistics on the null file: 26396 depolarisation systematic Ebuilder: 26399,26400,26416,26417,26419,26427 51 109 26456 26565 20004 far upstream stops data 46 26603 26649 taken over two nights