date run TEC B target P degrader comment start end 13 Oct 21367 21371 in no Be 29.6 -- attempt to reproduce muon beam 21372 21374 in no Be 29.0 -- find good beam to use with 49 hole collimator 21375 21383 in no Be 29.0 -- TEC collimator run 14 Oct 21384 21404 in no Be various -- momentum scan runs 21405 21413 in no Be 29.6 -- check the beam spot size vs Q6 and Q7 21414 21422 in no Be 29.6 -- check the beam in TEC with B2 scan 15 Oct 21428 21486 out no Be 120.0 -- Alignment 16 Oct 21487 in no Be 29.6 -- TEC efficiency 21488 21490 in no Be 29.6 -- Check Beam Spot vs. Q7 21491 21494 in no Be 29.6 -- Check correlation between DC and TEC measurements 17 Oct 21495 21498 out no no beam no beam -- Check PC8 wires 21499 21501 in no Be 29.0 -- reproduce 21308 21502 21513 in no Be various -- momentum scan runs 18 Oct 21514 21516 out no no beam no beam -- testing TDC 19 Oct 21517 in no C 29.6 -- Testing TEC after re-installation 21518 21519 in no C 29.6 -- muon beam with new target ladder and production target 20 Oct 21520 21525 in no C 29.6 -- runs using altered Bl1 beam spot positions on the production target 21525 21526 in no C 29.6 -- quads off alignment check 21527 21535 in no C 120.0 -- t0 runs 21537 21543 in ramping C 29.6 -- Taking a TEC test run while magnet ramping up (~1.6 T) 21544 21549 in 2.0 T C 29.6 -- Checking beam tune with magnetic field on 21 Oct 21550 21559 in 2.0 T C 29.6 -- searching for a higher rate beam tune 21560 21568 in 2.0 T C 29.6 -- beam tune studies with field on 21569 21572 out 2.0 T C 29.6 -- understanding current hardware configuration 21573 21587 out 2.0 T C 29.6 various establishing mu range in chambers using gas degrader 21588 21589 out 2.0 T C 29.6 70.00% data set 40 22 Oct 21590 21742 out 2.0 T C 29.6 73.24% 23 Oct 21743 21897 out 2.0 T C 29.6 73.20% 24 Oct 21898 21986 out 2.0 T C 29.6 73.20% 21987 21990 in 2.0 T C 29.6 73.2-90% beam characterization 21991 21995 in 2.0 T C 29.6 90.00% TEC collimator runs Q3-Q7 off 25 Oct 21996 in 1.96 T C 29.6 90.00% TEC collimator run Q3-Q7 21997 21999 in 1.96 T C 29.6 94.00% beam characterization 22000 22064 out 1.96 T C 29.6 74.00% data set 52 26 Oct 22065 22123 out 1.96 T C 29.6 74.00% data set 52 before maintenance day 22124 22170 out 1.96 T C 29.6 74.00% data set 41 after maintenance day 27 Oct 22171 22349 out 1.96 T C 29.6 74.00% 28 Oct 22350 22422 out 1.96 T C 29.6 74.00% 22423 22427 in 1.96 T C 29.6 74.00% beam characterization 22428 22429 in 1.96 T-2.04T C 29.6 74.00% beam characterization during ramp 22430 22433 in 2.04 T C 29.6 74.00% beam characterization 22434 22470 out 2.04 T C 29.6 74.00% data set 42 29 Oct 22471 22636 out 2.04 T C 29.6 74.00% 30 Oct 22637 22785 out 2.04 T C 29.6 74.00% 31 Oct 22786 22842 out 2.04 T C 29.6 74.00% 22843 22854 out 2.04 T C 29.6 74.00% beam studies 22855 22860 in 2.04 T C 29.6 74.00% beam characterization 31 Oct-1 Nov 22861 22869 in 2.04 T C 29.6 74.00% TEC collimator run 1 Nov 22870 22872 in 2.04 T C 29.6 74.00% TEC characterization of collimator runs (collimator out) 22873 22874 in 2.04 T C 29.6 74.00% compare nominal tune to ’¡ÈBlair's slits’¡É tune 22875 22879 in 2.04 T C(#2) 29.6 74.00% test new 1AT1 target (position #2 graphite) 22880 22890 in 2.04 T C(#2) 29.6 100.00% checking the stopping position of muons in the spectrometer 3 Nov 22891 22906 in 2.0 T Be 29.6 90 (64%?) run with TEC in (new (old) target ladder) 4 Nov 22907 22976 in 2.0 T Be 29.6 90 (64%?) run with TEC in 22977 23023 in 2.0 T Be 29.6 80-100 % readjusting the He content in the gas degrader 23024 23110 in 2.0 T Be 29.6 88.00% "real" run with TEC in 5 Nov 23111 23313 in 2.0 T Be 29.6 88.00% 6 Nov 23314 23518 in 2.0 T Be 29.6 88.00% 7 Nov 23518 23632 in 2.0 T Be 29.6 88.00% 23633 23668 in 2.0 T Be 29.6 88.00% Bulge tests 23669 23705 in 2.0 T Be 29.6 88.00% measuring stopping z for various B2 values 8 Nov 23705 23715 in 2.0 T Be 29.6 88-90% readjusting the He content in the gas degrader 23716 23769 in 2.0 T Be 29.6 90.00% test set for off center data set with TEC (B2+6G) 23770 23793 in 2.0 T Be 29.6 90.00% quads off tests in magnetic field 23794 23795 in 2.0 T C 29.6 90.00% carbon target tune/rate check 23976 23799 in 2.0 T Be 120.0 90.00% t0 runs, PU trigger 9 Nov 23800 23906 in 2.0 T Be 120.0 90.00% t0 runs, MLT trigger 23807 23821 in 2.0 T Be 29.6 90.00% B2 sweep 23822 23851 out 2.0 T Be 29.6 63.5%-74% prepare for B2+6G set. stopping z not right 10 Nov 23852 23999 out 2.0 T Be 29.6 74.41% B2 + 6G 11 Nov 24000 24167 out 2.0 T Be 29.6 71.26% 12 Nov 24168 24253 out 2.0 T Be 29.6 71.26% 24254 24275 out 2.0 T Be 29.6 76.06% setting up muon degrader for B2-10 G data set 24276 24326 out 2.0 T Be 29.6 73.37% B2-10.0 G 13 Nov 24326 24480 out 2.0 T Be 29.6 73.37% 14 Nov 24481 24419 out 2.0 T Be 29.6 73.37% 15 Nov 24620 24671 out 2.0 T Be 29.6 73.37% 17 Nov 24673 24690 in 2.0 T C 29.6 64.00% B2 scan, film degrader in at position 8 24691 24709 in 2.0 T C 29.6 64.00% quad steerig runs 24710 24718 in 2.0 T C 29.6 75.00% Search for PC5, PC6 voltage settings for PC6 pseudo PACT study 24719 24736 OFF 2.0 T C 29.6 86.00% Preparing for rate studies 24737 24794 in 2.0 T C 29.6 78.00% pseudo PACT runs PC5 HV = PC6 HV = 1600 V 18 Nov 24795 24815 in 2.0 T C 29.6 78.00% pseudo PACT runs PC5 HV = PC6 HV = 1550 V 24816 24824 in 2.0 T C 29.6 74.00% quad steering tests 24825 in 2.0 T C 29.6 74.00% spray tune for TEC collimator runs 24827 24838 in 2.0 T C 29.6 74.00% 49 hole collimator runs with spray tune enabled 19 Nov 24839 24843 out 2.0 T C 29.6 75.00% nominal tune, increased F0 size to vary rate 24844 24849 out 2.0 T C 29.6 65.00% rate increased to 4.5kHz using F0 24850 24856 out 2.0 T C 29.6 50.00% rate increased to 4.5kHz using F0 24857 24865 out 2.0 T C 29.6 55.00% rate increased to 4.5kHz using F0 24866 24914 out 2.0 T C 29.6 ~50.00% PC6 stops at rate of 4.5kHz, zstop_reg=-1.8, PC5 HV = PC6 HV = 1550 V 24915 24970 out 2.0 T C 29.6 ~50.00% PC6 stops at increased rate, zstop_reg=-2.0, PC5 HV = PC6 HV = 1600 V 20 Nov 24971 25067 out 2.0 T C 29.6 ~50.00% PC6 stops at increased rate, zstop_reg=-2.0, PC5 HV = PC6 HV = 1600 V 25068 25134 out 2.0 T C 29.6 ~50.00% PC6 stops at increased rate, zstop_reg=-2.5, PC5 HV = PC6 HV = 1600 V 25135 25161 out 2.0 T C 29.6 ~45.00% PC6 stops at increased rate, zstop_reg=-3.0, PC5 HV = PC6 HV = 1600 V 25162 25196 out 2.0 T C 29.6 ~44.00% PC6 stops at increased rate, zstop_reg=-3.5, PC5 HV = PC6 HV = 1600 V 21 Nov 25197 25278 out 2.0 T C 29.6 52.00% PC6 stops at increased rate, zstop_reg=-2.0, PC5 HV = PC6 HV = 1600 V 25279 25371 out 2.0 T C 29.6 various Transitioning to pure Al stops, from PC6 stops 25372 25420 out 2.0 T C 29.6 93.00% Pure Al stops 22 Nov 25421 25655 out 2.0 T C 29.6 93.00% Pure Al stops 23 Nov 25656 25741 out 2.0 T C 29.6 93.00% Pure Al stops 25742 25743 in 2.0 T C 29.6 na nominal configuration. Testing TEC with collimators in. 25744 25747 in 2.0 T C 29.6 na TEC collimator run 24 Nov 25748 25751 in 2.0 T C 29.6 na TEC collimator run 25752 25762 in 2.0 T C 29.6 na TEC collimator run, y module rebuilt, temp variations due to open bay doors 25 Nov 25763 25777 in 2.0 T C 29.6 na TEC collimator run, doors closed. 25778 25843 out 2.0 T C 29.6 73.00% nominal data set 26 Nov 25844 26025 out 2.0 T C 29.6 73.00% nominal data set 27 Nov 26026 26116 out 2.0 T C 29.6 73.00% nominal data set 26117 26210 out 2.0 T C 29.6 76.00% B2+6G data set 28 Nov 26211 26385 out 2.0 T C 29.6 76.00% B2+6G data set 29 Nov 26386 26452 out 2.0 T C 29.6 76.00% B2+6G data set 30 Nov 26453 26455 in 2.0 T C 29.6 na Q6 steering check 26456 26492 in 2.0 T C 25.9 na far upstream stops data set 1 Dec 26493 26565 in 2.0 T C 25.9 na far upstream stops data set 26566 26582 in 2.0 T C 29.6 na Q6 steering test and beam characterisation with field on 26583 26596 in 2.0 T C 29.6 na Q6 steering test with reversed TEC 26597 26602 in 2.0 T C 120 na t0 test with field on, MLT trigger 2 Dec 26603 26649 in 2.0 T C 25.9 na far upstream stops 26650 26651 in various C 25.9 na far upstream stops, rampdown started 26652 26662 in various C 29.6 na Enabled 29.6 MeV/c tune, B regs on, rampdown continued 26663 26679 off 0.0 T C 120 na TEC off alignment runs, DS trigger 26680 26688 off 0.0 T C 120 na TEC off alignment runs, PU trigger 26689 26692 off 0.0 T C 120 na TEC off alignment runs, MLT trigger 3 Dec 26693 26699 off 0.0 T C 120 na TEC off alignment runs, MLT trigger 26700 26712 on 0.0 T C 55 na TEC/DC alignment runs, B1 = 1630.7G(4880 DAQ) B2 = 1822G(5468DAQ) (not locked) 26713 26717 on 0.0 T C 55 na TEC/DC alignment runs, B1 = 1630.7G(4880 DAQ) B2 = 1827G(5483DAQ) (not locked) 26718 26725 on 0.0 T C 55 na TEC/DC alignment runs, B1 = 1630.7G(4880 DAQ) B2 = 1824G(5475DAQ) (not locked) 26726 on 0.0 T C 55 na TEC/DC alignment run, NMR= locked B1=1632G, B2 = 1765 26727 on 0.0 T C 55 na TEC/DC alignment run, NMR= locked B1=1632G, B2 = 1763 26728 on 0.0 T C 55 na TEC/DC alignment run, NMR= locked B1=1632G, B2 = 1761 26729 26735 on 0.0 T C 55 na TEC/DC alignment run, NMR= locked B1=1632G, B2 = 1759 26736 26745 off 0.0 T C 120 na TEC off alignment runs, DS trigger 26746 26759 off 0.0 T C 120 na TEC off alignment runs, PU trigger 4 Dec 26760 26763 on 0.0 T C 55 na TEC/DC alignment runs, B1 = 1630.7G(4880 DAQ) B2 = 1822G(5468DAQ) (not locked) 26764 26770 off 0.0 T C 120 na TEC off alignment runs, DS trigger 26771 26793 off 0.0 T C 120 na TEC off alignment runs, PU trigger 26794 26799 off 0.0 T C 120 na TEC off alignment runs, DS trigger 5 Dec 26800 26830 out 0.0 T C 120 na alignment with large collimators 6 Dec 26831 26838 out 0.0 T C 120 na alignment with large collimators, 26839 26880 out 0.0 T C 120 na alignment with large collimators, PC8 turned off(wire broken) 26881 26886 out 0.0 T C 29.6 na beam positron characterization 26887 26888 in 0.0 T C 29.6 na muon beam charaterizations with the field off, nominal settings 26889 26895 in 0.0 T C 29.0 na quad steering checks 26896 in 0.0 T C 29.6 na nominal muon beam characterization, target used during run 26897 26904 in 0.0 T C 29.6 na muon beam characterization using new graphite target, nominal tune